Natural marble renovation artificial marble renovation marble crystalline stone conservation
Nature floor del floor decoration
Reducing Tee: branch pipe outside diameter is different with main pipe outside diameters. forming process:Hydroforming, hot pressing, cold forming,According to Pressure and thickness: Sch5s, Sch10s, Sch10, Sch20, Sch30, Sch40s, STD, Sch40, Sch60, Sch80s, XS,Sch100,Sch120,Sch160,XXS;
Reducing Tee Reducing Tee,Tee Reducing,Stainless Steel Pipe Fittings ,Steel Reducing Tee CANGZHOU HAOYUAN PIPE FITTINGS MFG CO.,LTD , http://www.pipefitting-china.com
The long-term use of natural stone without maintenance or improper maintenance, the surface will appear a large area of ​​scratches, defacement, affecting the stone natural and beautiful decorative effect, if re-replacement will not only cost more, it will affect the normal work and life . The stone refurbishment process is to reconstruct the stone with good stone quality but with damaged surface. The method is to use a stone retreading machine with a special grinding disc to grind the damaged surface of the stone, from rough grinding, fine grinding, polishing to crystallization treatment. The process is mirror-finished to restore the natural texture and gloss of the stone on a damaged basis.
Which stones need renovation:
1. In most cases, decoration works will be mixed with many types of work. The movement of a large number of people and materials or the corrosion of decorative materials will directly damage the stone flooring that has been laid. In severe cases, it will cause large areas of fouling and will not be able to deliver. Standards; sometimes due to poor laying staff skills, uneven ground after the completion of the laying or scissors (stone uneven), then need to refurbish the stone.
2, stone after a long period of use even if properly maintained will be due to reasonable wear and loss of the original decorative effect; the second most of the renovation will always get a new one, but the stone floor generally do not need to be replaced, only need to choose a relatively simple renovation Deal with it, you will get a new effect.
Stone renovation process:
1. Repair damage and interstitial glue (seamless processing): Use electric tools to re-cut the original damaged surface and the stone installation of the middle seam to minimize the gap width difference. Use special marble glue to repair and make it as close as possible to stone color.
2. Shear bit grinding: The use of a special shear grinding piece to focus on the shear bit, making it close to the stone level.
3. Grinding and Polishing: Grinding with coarse and fine squeegee is adopted to make the surface smooth and smooth, and the crystal grain is appropriate.
4, protection: the use of special stone curing agent, so that it fully penetrated into the stone and the formation of a protective layer (water blocking layer), so as to achieve waterproof, anti-pollution, anti-corrosion and improve the weather resistance of stone an advanced technology.
5, crystallization: the use of targeted crystalline powder or crystal agent, in the special equipment and the pressure caused by the friction and the high temperature generated by the dual role of the stone, through physical and chemical reactions, in the stone surface crystal arrangement, forming a layer The clear, dense and hard protective layer plays a role of lightening and hardening the stone surface. This procedure is very important and lays a good foundation for future maintenance.
Product Name:Reducing Tee
Size:DN10-DN2500
Materials: A234 WBP-WP1-WP12-WP11, A403 WP 304-304L-316-316L, A402 WPL3-WPL 6,A860 WPHY 42-46-52-60-65-70,PG370,C20
Thickness: 2mm-100mm
Standard:GB/ANSI/ GOST/ JIS/ DIN
Crafts: Cold extrusion, Thermoforming
Connection: Welding
Package: Wooden boxes,Wooden pallets,According to customer requirements.
Brand Name: HY
Place of Origin: China (Mainland)
Certification: ISO.UKS.SGS.BV
Application: Chemical, Water, Oil and gas, Electricity