Mass acceptance image acceptance check standard (Photos)

Mason's tile work is very important. For the entire renovation project, the mason's decoration level not only affects the quality of the decoration, but also relates to the decoration of the beautiful issues. It is like the face of the decoration, health is not healthy, good or bad is in the face "On it, so we must not neglect. Here we follow the supervision to see what the first-class company's acceptance criteria are.


First, check the surface of the wall tiles




The decoration is beautiful, and the formal company requires all the colors and models of the wall tiles to be the same, and it looks neat and clean.




539) {this.resized=true; this.width=539;}" border=0>


Due to the loss in construction, one less wall tile in the bathroom, the informal company's construction staff did not ask the owner's consent to replace the wall with another color, it looks like an eye-catching patch. very ugly.




539) {this.resized=true; this.width=539;}" border=0>


5, tile "wall, floor" must be on the seam, to prevent water vapor infiltration into the wall, the collage is not less than 1/3 of the entire block, in addition, the shower room connection should also pay attention to the connection must be on the seam, otherwise it will Water seepage occurred.




539) {this.resized=true; this.width=539;}" border=0>


I do not know which irresponsible road guerrillas shop wall tiles, gaps between the walls of the gap between the rough, the seams are not uniform, and the width of the tile wall at the collage is less than 1/3 of the whole wall tile, it is difficult to see.




539) {this.resized=true; this.width=539;}" border=0>


6. The tile and tile are laid flat and the edges are aligned in a straight line, so that the whole wall can be neat and tidy.




539) {this.resized=true; this.width=539;}" border=0>


Looking at the seams on the corners, we know that the walls on the left are obviously much lower than the walls on the right, and the unevenness of the pavings.


Second, check the tile laying angle




539) {this.resized=true; this.width=539;}" border=0>


1. The yin and yang angle of the brick wall is less than 2mm/2000mm, and the angle should be 90 degrees vertically. The formal company asked not to use PVC corners because the PVC corners are circular arcs.




539) {this.resized=true; this.width=539;}" border=0>


2, this is the solution of the wall in the kitchen, when the brick wall tile corner is a little PVC angle, the whole corner looks rough, because it is PVC angle, long days are also easy to filth.




539) {this.resized=true; this.width=539;}" border=0>


3, the tile's positive corner gap is less than 1mm If the gap is greater than 1mm, not only affect the appearance, but also paved too weak, easily damaged.




539) {this.resized=true; this.width=539;}" border=0>


4. The sunken corner seams on the windowsill have been damaged. There is a missing corner on the tabletop. The gap is of course 1mm. It is ugly and not strong.




539) {this.resized=true; this.width=539;}" border=0>


5. The joints at the corners of the wall tiles should be connected at a 45-degree angle, so that the two walls of the corners will be connected tightly.




539) {this.resized=true; this.width=539;}" border=0>


6, because the wall tiles are all laid out and can not see clearly, so to determine whether the angle is 45 degrees, can also be observed carefully when the construction staff paving, the figure just posted a good wall tile angle is 45 Degree angle.


Third, check the relevant waterproofing project




539) {this.resized=true; this.width=539;}" border=0>


1. The marble bathroom partition between the bathroom and the kitchen must have a high density of marble, which can prevent water from seeping outside the kitchen or bathroom than ordinary materials.




539) {this.resized=true; this.width=539;}" border=0>


2. Between the bathroom and the living room, there is no waterproof partition made of marble, but simply raise the floor of the living room by 1cm. It takes time for the water to seep into the floor of the living room.




539) {this.resized=true; this.width=539;}" border=0>


3, bathroom and kitchen must be waterproof layer, otherwise the family will seep water, more terrible is that maybe the water will seep to the neighbors downstairs at home, we must pay attention.




539) {this.resized=true; this.width=539;}" border=0>


4, after a waterproof layer, do a layer of protective layer with mud before you can paving tiles. Because the waterproof layer can't be seen under the floor tiles, some small companies cut corners and simply do not do it.




539) {this.resized=true; this.width=539;}" border=0>


5, high and low outside the balcony floor tiles, floor drain 3-5mm/1000mm slope, so the water will flow to the floor drain, will not cause stagnant water




539) {this.resized=true; this.width=539;}" border=0>


6, the floor drain is not well protected, drain plug inside dirty stuff, will cause the water pipe to be blocked, the balcony will gather water.


Fourth, check the slot and switch around




539) {this.resized=true; this.width=539;}" border=0>


1, with the wall switch, the socket should be split smoothly without damage, in the construction of which requires to be careful Mason. The wall tiles around the socket on the picture are intact. Clean and beautiful.




539) {this.resized=true; this.width=539;}" border=0>


2. The joint between the socket and the wall tile is slightly damaged. Fortunately, the mason has been repaired. It does not seem to cause any serious problem.




539) {this.resized=true; this.width=539;}" border=0>


3, fixed to the slotted pipe, the wall nozzle to keep the hot and cold nozzle flat, high and low, the pipe is tightly sealed, not emptying.




539) {this.resized=true; this.width=539;}" border=0>


4. The wall tiles around the nozzle have been broken and it is difficult to see or handle it. This is an expression that the informal company is not responsible for.




539) {this.resized=true; this.width=539;}" border=0>


5. The faucet should also be carefully examined to see if the wall tiles are empty and if there are any traces of broken tiles on the faucet, the wall tiles on the hot and cold faucets on the balcony are well cut, undamaged and empty. drum.




539) {this.resized=true; this.width=539;}" border=0>


6. To check if the wall tiles behind the faucet are empty, it is best to see if the hole hidden behind the faucet metal sheet is filled with cement. If it is not filled, the faucet will be less solid.


Fifth, check the protection details




539) {this.resized=true; this.width=539;}" border=0>


1, marble is more expensive, generally used in windowsills, countertops should be covered with plastic film or newspapers and the like, in order to avoid dust and garbage stain the countertops.




539) {this.resized=true; this.width=539;}" border=0>


2. The marble countertops did not take any protective measures. Things were messed up on marble countertops, stained the countertops, and the hard objects scratched the marble surface.




539) {this.resized=true; this.width=539;}" border=0>


3. The tiles laid in the kitchen and the bathroom are protected by a disassembled carton. Everyone wears shoes and walks on them without damaging the performance of the tiles.




539) {this.resized=true; this.width=539;}" border=0>


4. The white tiles in the bathroom are not protected. They are stepped on by the construction and become dirty. The gaps in the floor tiles are also more troublesome to clean.




539) {this.resized=true; this.width=539;}" border=0>


5. The bathtub is a valuable item that should be protected. The owner is very careful to use the old sheets to cover the expensive jacuzzi and prevent dust from contaminating the bathtub.




[img]http://Netpic/Images/Article/20077181153232.gif" border="1" alt="A mess of things will crush the bathtub interior">


6, irresponsible construction workers will need things in, this will crush the bathtub inside, scratch the bathtub liner.


Sixth, other matters needing attention




539) {this.resized=true; this.width=539;}" border=0>


1, the balcony must use the outdoor wall brick, can not use the interior wall brick instead, the wall tile before plastering to remove the original paint, keep the floor tiles clean and tidy.




539) {this.resized=true; this.width=539;}" border=0>


2. The floor tiles on the balcony are dirty and the paint is placed directly on the floor tiles. If the paint gets on the floor tiles, it will be difficult to clean.




539) {this.resized=true; this.width=539;}" border=0>


3, tile caulking agent in the cement is not dry before filling in, pay attention to uniformity, so that the joints after drying seams and tiles are very coordinated, beautiful tile surface.




539) {this.resized=true; this.width=539;}" border=0>


4. The irresponsible mason cut corners, and the filling compound is very sparse. After the cracks are dry, there are black and white ugly.




539) {this.resized=true; this.width=539;}" border=0>


5, door and window cover side of the wall in the 14 days before the carpentry brickwork, wall bricks to be serious, the effect should be smooth, there are cracks to be repaired.




539) {this.resized=true; this.width=539;}" border=0>


6, the wall is not made of powder, there are many cracks, woodworking will enter the market, but this irresponsible mason is really a headache.




539) {this.resized=true; this.width=539;}" border=0>


7. Check whether the floor keel is clean or not. It is forbidden for the mason to mix the cement around the floor keel to keep the floor clean.




539) {this.resized=true; this.width=539;}" border=0>


8. In order to save time, the mason directly stirs the cement not far from the ground keel. The cement gets a very dirty place and there are traces after it is dried.




539) {this.resized=true; this.width=539;}" border=0>


9, the kitchen exhaust smoke pipe cage is relatively soft, pay attention to protection, do not destroy it in the kitchen construction, keep it clean and complete.




539) {this.resized=true; this.width=539;}" border=0>


10. The kitchen's stripping cage is damaged. The Mason family cooks here, burns it dirty, and there is a small hole above it.




539) {this.resized=true; this.width=539;}" border=0>


11. After the construction of the tile and wall is completed, the direction of the pipeline shall be marked with a crayon at the location where there is a pipeline, which is convenient for installation and implementation of other related projects.




539) {this.resized=true; this.width=539;}" border=0>


12. This wall has water pipes hidden inside, but the constructors have forgotten to mark the direction of the water pipes on them. If other cabinets are to be installed, they have to guess the direction of the water pipes, which is troublesome.

Tile Tile Marble Faucet Cement Socket Windows Living Room Wall Color Kitchen Decorating Picture Decoration Living Room Decoration Partition Living Room Picture Cabinet Door Marble Tile Partition Cabinet Partition Door Marble Cabinet Kitchen Wall Tile Kitchen Cabinet Door Floor Tile Exterior Tile Floor Tile Kitchen Tile Balcony Tile Tile Tile Picture

Cob Par Light

Cob Par Light ,Led Cob Par,Cob Led Par Light,Cob Led Stage Lighting

Big Dipper Laser Science And Technology Co., Ltd , https://www.bigdipper-laser.com