Development and Reform Commission: the implementation of the filing system for overseas investment projects of less than US$1 billion

The reporter learned from the National Development and Reform Commission yesterday that in order to speed up the pace of Chinese enterprises going global, the National Development and Reform Commission recently issued the “Measures for the Administration of Approval and Filing of Overseas Investment Projects”, which greatly improved the approval authority for overseas investment projects and narrowed the scope of approval. , prescribed to the general...
The reporter learned from the National Development and Reform Commission yesterday that in order to speed up the pace of Chinese enterprises going global, the National Development and Reform Commission recently issued the "Measures for the Administration of Approval and Filing of Overseas Investment Projects", which greatly improved the approval authority for overseas investment projects and narrowed the scope of approval. It is stipulated that the general overseas investment projects shall be subject to a filing system.

The National Development and Reform Commission said that the promulgation of this "Measures" is an amendment to the "Interim Administrative Measures for the Approval of Overseas Investment Projects" issued by the National Development and Reform Commission in 2004. The changes are mainly reflected in three aspects.
First, the approval authority for overseas investment projects has been greatly improved, and the scope of approval has been narrowed. It is stipulated that all projects with a minimum investment of less than US$1 billion will be filed and more than US$1 billion will be approved.
The second is to simplify the process and define the time limit. It is stipulated that for projects approved by the NDRC, local enterprises may not report to the county, city or province level, but only through the provincial development and reform department to report to the National Development and Reform Commission. The time limit for the NDRC to approve the project is 20 working days, such as If the application materials do not meet the requirements, the NDRC must inform the project application unit to make corrections within one working day within 5 working days.
The third is to clarify legal responsibilities and strengthen administrative accountability. The "Measures" stipulate that if the staff of the National Development and Reform Commission violates the prescribed procedures and conditions for handling approval, filing, etc., if they have abused their powers or neglected their duties, they shall pursue the responsibility of the responsible person according to law.

Types : Weld neck Flanges (WNRF), Slip-on Flanges (SORF), Blind Flanges (BLRF), Lap Joint Flanges (SOLJ), Socket-weld Flanges (SWRF), Screwed (Threaded) Flanges, Long weld neck Flanges (LWNRF), Spectacle Blind Flanges Spacer & Blind Flanges, Ring Type Joint Flanges (RTJ), Reducing Flanges, Raised Face (RF) Flanges, Orifice Flanges, Large Diameter Flanges, Custom Flanges, Drawing Flanges, Forged Flanges, Plate Flanges, Flat Face Flanges, ANSI Flanges, ASME Flanges, BS Flanges, DIN Flanges, API, EN Flanges etc.

ANSI/ASME B16.5, B 16.47 SS Flanges, Stainless Steel 304, 316, 316L Slip On Flanges, Stainless Steel 310, 310S, 446 Blind Flanges, SS Forged Flanges, Steel Orifice Flanges, SS Reducing Flanges  

Stainless Steel Flanges Specification:
Grade :SS 304, 304L, 304H, 316, 316L, 316LN, 316Ti, 309, 310S, 317L, 321, 347, 409, 410, 420, 430, 446, 202 Etc.
Standard : ASTM A182 / A240 & ASME SA182 / SA240
Size : ½" to 48″
Dimensions : ANSI/ASME B16.5, B 16.47 Series A & B, B16.48, BS4504, BS 10, EN-1092, DIN, JIS-K, etc.
Class / Pressure: 150#, 300#, 600#, 900#, 1500#, 2500#. PN6, PN10, PN16, PN25, PN40, PN64 etc.

Stainless Steel Flange

Stainless Steel Flange,Stainless Flange ,Stainless Steel Pipe Flange,Steel Pipe Flange

Zhejiang Max Stainless Steel Co.,Ltd , https://www.cnstainlesstube.com