Understand the technical requirements of anti-static floor
Anti-static raised floor is mainly used in computer room, data processing center, laboratory, microwave communication station room, program-controlled telephone exchange room, mobile communication room, satellite ground station room, radio control room, television transmission station control room, broadcast control room, monitoring Room, central control room, etc.
Sight glass is used for observe the medium in the pipe system, Ningbo RMI Plastic Co.,Ltd offer plastic sight glass with PVC, CPVC, PVDF, PP body and borosilicate glass. Plastic sight glass is most suitable for corrossive medium, it is widely used in chemical industria pipe systems. flange end fit for DIN PN10, ANSI CL150 and JIS 10K standards.
Ningbo RMI Plastic Co.,Ltd offer Sight glass with specification:
Size:DN15~DN300 (1/2 inch ~ 12 inch)
Glass:Silicate glass
Sealing: EPFM, Viton
Plastic Sight Glass,PVC Sight Glass,PP Sight Glass,PVDF Sight Glass Ningbo RMI Plastic Co.,Ltd , https://www.rmiplast.com
Anti-static floor technology requirements:
(1) Cleaning up the ground: The original grass-roots ground should be leveled. If there is no obvious unevenness, use a shovel to remove the debris on the ground and clean it up.
(2) Locating the line: According to the flat size of the room and the equipment layout, according to the floor module of the movable floor, the laying plan and reasonable laying method should be followed. The following principles should be followed: a. If there is no control cabinet and other equipment in the room, the geometric dimensions are In line with the floorboard modulus of the movable floor, it should be laid from the inside out. b. If the plane size of the room does not conform to the modulus of the plate, the central points in the two directions of the room should be found to see how much the dimensions of the two sides differ. If the difference is not obvious, it should be laid from the outside to the inside; if the difference is large, it should be carried out Symmetrical grid, laying from inside to outside. c. If there are no control cabinets and other equipment on the indoor floor (when holes are to be left), the laying direction and sequence should be considered comprehensively. d. Determine the laying height according to the design requirements. Based on the above, after the laying method is determined, the work of finding, setting, dividing, and positioning the line must be performed. That is, it is necessary to project the mark of the dividing line on the ground, and the mark of the mark on the surrounding wall in order to facilitate Operational control during construction.
(3) Installation of adjustable brackets and beams: Adjustable brackets should be placed in accordance with the height control lines drawn on the walls around the room and on the base floor, and adjustable beams should be placed on the ground. Ruler adjusts the height of the stand to the height of the entire room. Each nut on the floor support should be tightened after leveling to form a networked bracket.
(4) Laying of raised floor: Laying of movable floor blocks and adjusting the horizontal height to ensure that the contact angles of the four corners are smooth and tight. When the movable floor blocks do not conform to the modulus, the insufficient part can be trimmed after the cutting according to the actual size (the floor must be finely cut), And equipped with the corresponding adjustable brackets and beams.
(5) Anti-static grounding: The grounding connection shall be made after installation of the movable floor, and its technical performance shall meet the design requirements and construction acceptance standards.