Consumers usually monitor their construction quality by taking a personal eye on the site so that problems can be solved in time. In fact, if it is an outsider in the decoration, even if it is soaked in the construction site every day, problems cannot be seen. For those who suffer from lack of time, "staring at the site" is even more unrealistic. Therefore, if consumers can grasp the progress during the renovation process and carry out inspections in stages, they can avoid the pain of going around and control the quality of construction. 1. Before entering the market: Check whether the demolition project complies with the contract, whether there is any hidden safety hazard, whether the wall surface treatment is clean, and whether the number, grade, and specifications of the incoming materials are in agreement with the prior agreement. 2. Water Circuit: The acceptance of the second stage should be a single acceptance of the waterway and circuit transformation. Consumers should check whether all the transformation lines are unobstructed, whether the layout is reasonable, and whether the operation is standardized under the operation of a professional hydraulic or electrician. Reconfirm the actual size of the circuit modification. Only after the line is changed, the putty worker can continue to seal the wall and putty. 3, carpentry work size: the third acceptance to be done after the carpentry foundation, this time the room ceiling and plaster line should also be completed, the kitchen and bathroom wall tiles have been posted well, while the need to paint The wall should be scraped twice. Acceptance work at this stage is very important, consumers should carefully check the drawings, confirm the size of the parts, such as found inconsistent place, promptly prompt the construction team to modify. 4, woodworking work quality: When all the fine wood products veneer paste well, wood nailing is completed, the consumer can carry out the fourth phase of acceptance. This time is basically half of the time, the inspection of this stage should focus on the color and texture of wood products and large areas of flatness and gaps are uniform. After the completion of wood products, oil workers can start the primer treatment work, and all floor tiles should also be posted in this stage, which is the fifth stage in the phased acceptance. 5. After completion: The final phase of acceptance is the most comprehensive and thorough. Consumers are required to check the installation of footboards, sanitary ware and hardware, whether the finish of wooden products is in place, whether the paint on the wall or top surface is uniform, whether the panel of the electrician is properly installed and the position of the light fixture, and whether the circuit connection is correct. In addition, consumers should require the construction team to clean the room thoroughly before moving back.
Entrance decoration decoration company room paint coating bathroom ceiling material bathroom ceiling bathroom floor tile bathroom size
ZHejiang Sealand Technology Co., Ltd. is a trustworthy manufacturer of LNG Mass Flow Meter, LNG Mass Flowmeter, LNG Flow Meter, LNG Flowmeter, LNG meter, ATEX, IECEx & CE approved.
We are the only Chinese brand who gets ATEX, and we get it from TUV SUD, the most authoritative institute for ATEX. Our meter passed all tests carried out by TUV without any modification. Their only suggestion is to replace the cable entry device with a ATEX approved one; thus, please rest assured that we produce our meter with high standard :)
Besides, Sealand meter and calibration lab are approved by CNAS, member of ilac in China.