The most likely problems with signing a renovation contract
Entrance decoration restaurant decoration home decoration decoration company interior decoration decoration design decoration decoration company Slot Diffusers,Slot Air Diffuser,Slot Diffuser Grill,Ceiling Slot Diffuser Guangzhou Jointair Co., Ltd. , http://www.jointairaccessories.com
The main body of the contract is not clear
The contract should first fill in the name and contact method of Party A and Party B. Here we should pay attention to a detail. Many companies only cover one chapter with company name. You must ask the decoration company to fill in the content and check it. You should also pay attention to the name of the fitting company that signed the contract, and whether it is the same as the name of the company that was stamped on the contract.
Supervision concept is fuzzy
If the contract provides for the implementation of engineering supervision, as the project supervisor, its identity is independent of the decoration company.
Incomplete documentation
The project budget book approved by both parties and a full set of design and construction drawings are all valid constituent elements of the contract. When some decoration companies signed a decoration contract with consumers, these written documents were incomplete and brought hidden dangers to the future home improvement projects.
Consumers should keep the above three documents and payment documents securely.
Unclear rights and obligations
The contract stipulated the work that should be done by both parties to ensure the smooth progress of the project. For consumers, special attention should be paid to the following provisions in the contract: In order to ensure the safety of buildings, indoor load-bearing structures cannot be removed. If the non-load-bearing structures or equipment pipelines of the original buildings are demolished and changed, they shall be responsible for going through the corresponding approval procedures for the housing management department.
Increase or decrease items did not join the contract
During the construction process, due to the increase or decrease of construction projects or other factors, the original contract must be changed. Consumers and decoration companies must negotiate with each other, and sign a written change agreement, with related duration, project budget and drawings. All changes must be made and signed by both parties.
Material supply is not confirmed
The decoration company has no right to change the materials provided by the consumer without authorization. If problems are found, it is necessary to take timely remedial measures such as replacement and replacement. As for the materials provided by the decoration company, consumers should conduct inspections. Once the decoration company has the defect of concealing the material or use materials that do not meet the agreed standards, the consumers have the right to request redo, repair, replacement, or reduction of the price. Compensation for losses, etc.
No delay in schedule
If there are delays in the construction period, consumers should treat them separately according to specific circumstances.
If it is due to the decoration company's responsibility can not be completed on time, the construction period is not delayed, the decoration company should pay the consumer the penalty