Organize and archive! Fire protection program here!
First, the scope of firefighting facility maintenance and repair The scope of maintenance and repair of automatic fire alarm systems includes: 1 , fire automatic alarm system; 2 , automatic sprinkler system; 3 , gas fire extinguishing system; 4 , fire hydrant system; 5. The maintenance and repair of fire linkage equipment is responsible for the interface to the fire linkage equipment; 6 , fire alarm lines and fire-fighting linkage lines and fire linkage power lines, pipeline problems, including short circuit, open circuit. Maintenance company will repair the maintenance and repair failures free of manual repair ( such as man-made short circuit, open circuit, equipment damage and other failures are not within the maintenance scope ) ; if the equipment is aging and damaged, can not be repaired, the owner is responsible for the purchase of new The equipment, maintenance company responsible for the installation. Owners should provide the necessary working environment and personnel in the process of system testing and maintenance, otherwise there is an unpredictable loss. Maintenance company has the right to refuse to pay and provide the above services. Second, the service scope of each subsystem in the fire protection system 1 ã€Fire automatic alarm system ( 1 ) Periodic inspection and test of fire alarm system a. Test each function of the fire alarm controller on a monthly basis; b. The use of special testing instruments to test the detectors in batches and in batches on a quarterly basis, and the confirmation light display (not less than 25% of the total number ); c. Perform one or two charge and discharge tests on the standby power source each year , and switch the main power supply and standby power automatically between 1-3 times. ( 2 ) Make regular inspections and tests on linkage equipment of fire fighting systems a. Each year , fire-fighting linkage tests are conducted twice for control devices such as smoke prevention and control devices and fire shutter doors; b. Conduct fire-fighting linkage tests twice a year for fire accidents; c. Each year, the elevator is forced to stop at the first level of fire-fighting linkage test twice; d. Conduct intercom call tests twice a year for fire communication equipment in the fire control room; e. Annually cut off non-fire power supply and fire-fighting linkage test twice. ( 3 ) Repair the faults of the fire automatic alarm system control lines and linkage lines ( 4 ) Repair the failure of the fire automatic alarm system ( 5 ) Inspection and maintenance of failures of fire communication lines, fire main engine power supply inspection and fire main engine grounding lines of automatic fire alarm systems 2 , fire hydrant system ( 1 ) Start the fire pump test every month and carry out fire hydrant button linkage activation pump test. ( 2 ) Check all the control valves on the system every month to ensure that the control valves are in normal working condition. ( 3 ) Fire hydrants are checked every month and problems are found to be dealt with in a timely manner. ( 4 ) The hydrostatic pressure test of the most adverse point fire hydrant is performed quarterly. ( 5 ) Inspect the equipment such as water guns and water hoses inside the indoor fire hydrant box every six months , and promptly notify the user of the problem. ( 6 ) Check the interface and accessories of the pump adapter each year. ( 7 ) Check the effluent status of fire hydrant every year. Examine the fire hydrant in key locations every year. 3 , automatic sprinkler system ( 1 ) Check the water source control valve and alarm valve group every month to ensure that the system's various valves are in working condition. ( 2 ) Start the spray pump test once a month. ( 3 ) Start the solenoid valve once every month. When the malfunction occurs, immediately notify your organization of prompt replacement. ( 4 ) Each month, we use FireBreaker software to visually inspect the nozzles and find that abnormal nozzles are promptly replaced. When there are foreign materials on the nozzles, they are promptly removed. ( 5 ) Perform a discharge test on the discharge test valve next to the wet alarm valve every quarter to verify the water supply capacity of the wet alarm valve. ( 6 ) The water flow indicator shall be tested every six months using a terminal water test device. ( 7 ) Inspect and maintain the interface and accessories of the pump adapter each year. ( 8 ) Annually check the fire fighting water level of fire fighting water tanks, fire fighting water tanks and fire pressure water supply equipment and the pressure of fire fighting pressure water supply equipment. If any problems are found, assist your organization in a timely manner. 4 , gas fire extinguishing system (1) every six months to check maintenance of gas control panel, to ensure the normal operation. ( 2 ) Check whether the pressure of the gas cylinder meets the specifications and whether there is any leakage. ( 3 ) Check whether the manual and automatic deflation devices are normal every month. (4) every six months simulated smoke alarm system, heat detectors operate simultaneously, checks whether the solenoid valve cylinders operation, if the control panel has deflated signal, bell, buzzer operation. 5 , fire district (1) Check the integrity of wooden fire doors, fire shutter doors, and electric fire doors every week. (2) Start or stop the fire shutter door and electric fire door test manually or automatically every quarter . Check the performance. 6 , smoke prevention system (1) Check weekly whether the air supply, the working environment of the exhaust fume room, and the blower, smoke exhauster, power supply control cabinet, air supply valve, exhaust valve, etc. are in good condition. (2) Manually or automatically open the exhaust valve, start / stop blower, and smoke exhauster every six months to check its performance. (3) Turn off the air conditioning ventilation system and electric fire damper test manually or automatically every six months to check its performance. 7 , emergency lighting evacuation instructions (1) Check weekly whether emergency lighting and evacuation signs for safety exits, evacuation passages, and important places are in good condition. (2) Test whether the emergency lights and evacuation indicators can work normally after the power is cut off every month. 8 , other (1) Check the dry powder fire extinguisher's pressure, weight and expiration date every quarter. Spray test if necessary. (2) Check whether the water collection pit equipment, self-rescue escape equipment, fire-fighting power supply and automatic switching equipment are in normal and intact condition every month. (3) Examine the switching function of the end of fire power supply on a quarterly basis. Third, maintenance standards 1 , to ensure the normal operation of the system. 2. The quality of maintenance must comply with the requirements of the as-built drawings approved by both parties and meet the requirements of the existing fire codes. 3 , equipment failure, maintenance company received failure information or received notice from the user within 12 hours to send people to the scene, within 24 hours to repair troubleshooting. In the absence of accessories, you should report to your organization in a timely manner and take effective emergency measures to prevent accidents. 4. Provide detailed monthly inspections, quarterly inspections, and annual test reports to facilitate the owner's unit's filing. Fourth, the construction of fire protection facilities inspection and maintenance services During the maintenance period, the equipment within the maintenance scope jointly confirmed by both parties shall be inspected, repaired and maintained by the maintenance company in accordance with requirements. The owner of the materials, components, and parts that are replaced during maintenance. The information in this article comes from the Internet and was reorganized and edited by China Rescue Equipment Network. Custom Sheet Metal Stamping,Custom Metal Stamping,Welded Steel Pipe,Custom Welding Casting JIANGSU TONGDE INTERNATIONAL TRADE CO.LTD. , https://www.tongdetrade.com