Seven instructions for the installation of differential pressure balance valve
January 11 12:09:03, 2023
Pressure differential balance valve installation of the seven Notes 1, the pressure balance valve should be installed in the return pipe, the valve connected to the pressure pipe, the other end of the pressure pipe connected to the water supply pipe, it is recommended to install pressure water supply pipe 1 / 2 "ball valve, in order to start to eliminate the clogging function; 2, pressure balance valve medium flow direction should be consistent with the direction of the body arrow; 3, before the pressure pipe in the water supply pipe should be installed on the filter to avoid poor water quality caused by the valve Lose automatic adjustment function; 4, pressure balance valve water supply pipe and the return pipe before the valve should be equipped with pressure gauges, easy to adjust the control pressure; 5, the pressure balance valve found that the system flow is too large or too small, Probable cause is that the trapped debris stuck on the valve plug during the installation of the pipe component can close the 1/2 "ball valve for 3-5 minutes, and if it is lightly blocked, it can be automatically eliminated, if still not eliminated To disassemble the valve check to eliminate clogs; 6, control the pressure difference adjustment method: adjust the pressure regulating valve stem counterclockwise to observe the pressure difference.
It's for hand soldering
repairing, use with iron tip. Solder braid can absorb bad soldering
point inside, then you can rework PCB or other components, parts.
Our solder braid is
non-halogen, with strong solder absorption capability, in full compiance
with No-Clean requirements of electronic grade.also meet RoHS &
Reach regulations.