Decoration introduction knowledge: solid wood floor keel paving should pay attention to what aspects

Eighty-five percent of all problems that occur in actual use of solid wood flooring are caused by improper laying, 10% due to improper use, and only 5% due to the floor's own production and processing problems. It can be seen that whether the paving process is reasonable or not is the most important factor influencing the floor use effect. So, what are the wrong ways to avoid laying floors? As an example of the more common keel laying method, the following are the main types: The ground is not flattened

The unevenness of the ground will cause some floors and keels to hang, and it will make a sound when stepping on.

Wooden keel without moisture treatment

Nowadays, non-dried keels made of pine wood are usually used for construction. They are fixed on the ground 30 days in advance, and there is no moisture barrier between the ground and the keel. When paving the floor, it is laid directly without checking the moisture content of the keel. In fact, the moisture content of the keel is usually about 25% at this time, and the qualified moisture content of the wooden floor is generally about 12%. The humidity difference is too large to cause the wooden floor to rapidly absorb moisture, causing the floor to arch and accompanied by the paint bursting phenomenon.

Wooden keel fixed with iron nails

The use of wooden wedges and iron nails in the construction will cause the nails to be insufficient due to the small contact surface between the wooden wedges and the nails. This can easily cause loose wooden keels, and sounds when treading the floor.

Assembled too loose or too tight

The expansion and contraction of wooden floor are changed with the changes of the ambient temperature and humidity. Therefore, in the development of wooden floor pavement program, according to the use of the location of the ambient temperature and humidity level to arrange the tightness of the wood floor assembly. If it is too loose, there will be a large gap in the floor contraction. When it is too tight, the floor will arch when it expands.

Renovation works cross construction

In the construction, wood flooring is laid first, and then other construction projects are performed on the floor surface. This is the usual practice of the current decoration team. In this way, after the floor is finished, it often takes a month or more to paint. During this period, there are no isolation measures for water vapor and chemicals on the floor and surrounding environment, which may cause the wooden floor to be deformed and cracked due to the rapid change in moisture content.

Nature floor del floor paint

Diamond Saw Blade

This diamond Saw Blade is used for various granite, marble, concrete, etc. With special design and world-advanced technology of diamond brazing, the edge of saw will be free cutting, the cutting speed will be faster and the efficiency of cutting will be improved greatly.It is used for cutting high hardness granite, marble, concrete timber PVC tube brick Angle steel rebar and other kinds of materials.Diamond Saw Blade

Diamond Saw Blade,Circular Gringing Saw Blade,Wheel Diamond Saw Blade Cutting,Wheel Diamond Cutting Disc

Behappy Crafts (suzhou)Co.,Ltd , https://www.haoyuebehappy.com