Winter decoration should pay attention to matters

Winter Construction Notes

{1} Room temperature should be above +5°C.

{2} Indoor temperature: It should be moderate (the human body does not feel dry).

{3} Moderate indoor ventilation: moderate ventilation.

{4} When the wall top construction scraping wall lining is indoors, the ventilation volume should not be too large, so that the wall of the scraping wall lining is naturally air-dried, and the construction temperature should be above +5°C.

{5} Wall top latex paint construction temperature should be above +5 °C, and should not be ventilated.

{6} The paint construction temperature should be above +8°C, and be moderately ventilated.

{7} After plywood materials are put into the market, they should be placed in a stack and sealed with a primer. The code should not be placed in direct sunlight or in a heated location.

{8} After the water and electric lines are slotted, the cement mortar used to fill the grooves should be made of gas-hard (dry) mortar, and should be scraped after 48 hours of filling (above room temperature +5°C). Engineering or other process.

{9} The construction site should be regularly showered with water to maintain proper humidity.

Three trees paint paint latex paint cement heating

Draining Basket/rack

stainless steel, sink strainer,fruit vegetable washing drain basket,kitchen tool,draining rack, draining basket.

Shenzhen Lanejoy Technology Co.,LTD , https://www.baking-rack.com