Installation steps and maintenance of steam sandwich pan
Steam sandwich pot installation steps 1. Fix the fixing screw of the pot body, and the pot body will not shake when tilted. 2. Connect the components correctly. Use attention 1. When entering the steam, look at the pressure gauge and slowly open the inlet valve until the pressure is required. Do not exceed the rated working pressure when using it; the steam trap should keep working normally and keep the condensate in the pot overflowing in time to avoid affecting the heating effect; Normal work should be repaired in time and then used. 4. The chloride ion content of the water used should not exceed 25mg/L. Maintenance 1. The steam leakage of the inlet pipe and the outlet pipe joint should be repaired or replaced in time. 5. After the pot is used for 1 year, it will be used by the local technical supervision bureau for inspection and supervision. Concerned about surprises Label: Installation steps and maintenance of steam sandwich pan Previous: Common faults and troubleshooting methods of vibrating discs Next: Maintenance methods of pump bearings and attention when disassembling G70 Eye Slip Lifting Hook,G70 Lifting Hook,G70 Eye Sling Hook,G70 Grab Hook Shandong Shenli Rigging Co.,LTD. , https://www.shenliriggingcn.com
3. After the installation is completed, it should be checked for empty vehicles, and it can be put into operation after normal operation.
2. For the safety valve, it can be adjusted according to the pressure of the user's own steam.
3. Tilt-type agitated sandwich pot, if necessary, should be lubricated with 30#--40# oil in each rotating part before use.
2. Pressure gauges and safety valves should be inspected regularly, and replaced and repaired in case of failure.
3. After the gearbox starts to be used for 50 hours, it should be removed and the lubricant removed. Re-add 30#--40# clean engine oil. After 150 hours, change the oil for the second time. Afterwards, depending on the specific situation, each use is 1000. Change the oil once a day.
4, anti-rust oil peeling, should be painted in time, painted outside the paint, it is recommended to use X55-3 aluminum powder ethylene water-resistant paint.