Hardcover room detailed acceptance method to see who can still you

Buying a house is a headache. Acceptance of the house is also not a hassle. Although it is a hardcover room to buy, it saves a lot of decoration troubles, but it still needs careful acceptance. Maybe the details were not noticed and they were "Fudged". So how do you check it? The
Preparation for inspection The inspection of the house is a hard and complex project, so be sure to make preparations before the house inspection, so that you can check the house to get it right. The purchase contract must be prepared, and many attachments to the contract are of great significance in the inspection of the house, such as the distribution map of the community, the details of the agreement and so on.
Take the key to get the key before acceptance of the house, the key number is relatively large, there are floor keys, door keys, water meters, meter keys, be careful not to miss.
Material confirmation The decoration material confirmation sheet is also an indispensable material for acceptance. It records the detailed information of the material, including the brand, style and model, and it needs to be checked when accepting the hardcover room.
Ready drawings and drawings of the room type should be prepared before acceptance of the house. Not only should the floor plan of the house be prepared, but the circuit and waterway drawings should also be complete.

Check the drawings and carefully check the drawings to see if the location of the important facilities changes and the changes should be recorded; for example, the location of the box design should be above the wall, and the construction party has made changes. It is difficult to clarify the responsibility in the future without modifying the design.
The acceptance structure finds that the structure of the hardcover room is inconsistent with the contract. It must be submitted to the real estate developer before the arrival. If the resistance is encountered, it can be reported to the relevant government departments. If only the non-structural problems are found, the written record can be made when the house is handed over. The real estate firm has written a commitment to repair within a certain time limit. The first step is to inspect the whole house after renovation, check the area, check the orientation of the location, measure the public area, and check whether some outdoor facilities are intact.
Checking Projects Checking project projects is often overlooked by many owners and it is considered unlikely that problems will occur. In fact, many owners are surprised to find that construction projects have been missed.
The material brand inspection room should pay attention to whether the materials used are consistent with the promised on the contract, whether it is a well-known brand, whether the model style corresponds, and so on. If there is any mistake, it shall be negotiated in a timely manner.

Checking whether the balcony can be closed is a problem that the owner generally needs to pay attention to after closing the house. The owner of the house must also consider that if the balcony is to be closed in the future, some layouts may need to be changed.
The height of the floor confirms that such a problem sometimes arises after the decoration of the small high-rise buildings. The floor height is inconsistent with the promise of the developer. The high-rise building that is already tense before the renovation is more likely to become depressing after the renovation.
Checking whether the exhaust hole of the exhaust hole has been left intact is a link that should not be overlooked in the acceptance. The ceiling can be opened to check whether the pipes are all in place.
Some vacant structures in idle space must not be neglected. Special attention should be paid to the size and what can be used in the future. For example, this kitchen is not enough space for refrigerators. It is very embarrassing.
The circuit inspection circuit refers to the position and matching of the socket, the type of the wire and the capacity of the largest power-consuming device. This requires consumers to ask the property management company or developer in their community for the basic drawings of water, electricity and other concealed works. In the future use, if there is a short circuit or water cut, it can be repaired by a professional according to the drawings. In addition, we must also pay attention to whether the leakage protection switch of the distribution box has lighting; whether the ordinary socket, high-power socket, etc. have a clear shunt, whether the installation of the panel switch is smooth, and whether the switch is valid.
Waterway inspections The ordinary real estate waterways are usually of three kinds, tap water, hot water and medium water. Reclaimed water is non-potable water, which is used for collecting and utilizing rainwater. It is generally used to flush toilets or watering flowers. Consumers need to know if hot and medium water are available and whether they are taking the wrong pipe. Also check the position of the water meter, which should be at the water outlet of the kitchen or bathroom. In addition, the material of the water pipe is directly related to life and must be determined as a qualified material designated by the country. If the water pipe material is too bad, it is easy to leak water later. The best water pipe material is copper pipe, but at present, there are not many projects using copper pipe in Beijing; PPR pipes imported from Germany are also good.
With the renewal of the concept of air quality, environmental protection has become the most important link for consumers in home decoration, and air pollution is the most prominent problem in decoration pollution and is the main cause of many kinds of physical and mental diseases. Since the materials used in the fine decoration rooms are purchased by the developers, the owners cannot control the quality of the materials. Therefore, the first thing the owner must do to confirm the quality of the air is when the property is delivered.

Fine decoration model house new house acceptance notice new house acceptance stage

Keychain Light

Keychain Light

Keychain Light,Rechargeable Keychain Light,Small Keychain Light,Button Keychain Light

Cangnan Younglite Electrical Co., Ltd. , https://www.younglitetec.com