Kitchen and ceiling installation order can not be installed in order

Since the invention of the integrated ceiling, it has been highly favored by the market. It has many functions such as heating and ventilation, and can also change the monotonous color of the ceiling. In the kitchen and bathroom, we often install integrated suspended ceilings. With the continuous development and expansion of the industry, we have developed customized ceilings for the whole house at this stage. The following small series introduces the installation sequence of kitchen ceilings.

Kitchen ceiling installation order

1, the line

According to the horizontal line of the floor elevation, use the vertical vector of the ruler to reach the design elevation of the ceiling, play the position line of the keel on the top plate, and bomb the horizontal line of the elevation of the ceiling on the wall.

2, install the main keel boom

After elevating the horizontal elevation line of the ceiling and the main keel position line, the elevation of the lower end of the boom is determined. According to the position of the main keel and the spacing between the hangers, one end of the suspension rod without bolts is fixed under the floor with an expansion bolt; the boom is used for 6 m. Reinforced steel (8mm flat steel).

3, install the main keel

Fit the suspender nut and pre-mark the pendant on the main keel. Put the main keel of the assembled pendant into the corresponding hanger bolt according to the position of the splitter wire, and tighten the nut to match the main keel. Fit the fittings, pull the wire to adjust the elevation and straight, attach the main keel to the installation hole, set and connect the fastening.

4, install sub keel

According to the already subminded sub keel line, the card is placed with secondary keel triangles, and wooden keel is used. The spacing between the secondary keels is 600mm. The main keel spacing according to the design will be used to suspend the secondary keel through the triangle pendant. On the keel; When the length of the secondary keel needs multiple continuous extensions, use the secondary keel to connect the secondary keel while connecting, straighten and fix it.

5, install the side aluminum bar

The specification of the aluminum strip is: 25mm*25mm. The elevation of the ceiling is required to fix the aluminum strip around the wall with cement nails.

6, install the aluminum buckle board

When installing the ceiling aluminum buckle plate, press lightly in the order of the flanges and place the two sides of the square plate completely into the secondary keel, and then push tightly. Strictly prohibit loading and unloading; and adjust the side aluminum strips to straighten out the fixed side aluminum plates. According to the design requirements, 600mm*600mm punched aluminum gusset plate is used for the ceiling of the project.

7, install lamps and vents

According to the ceiling plan layout, layout lamps and vents; installation of aluminum buckle plate, according to the size of lamps and vents to open holes, install lamps and vents.

Kitchen and ceiling installation considerations

1. The aluminum buckle plate, plastic steel plate or integrated ceiling and the supporting keel and accessories purchased when the kitchen ceiling is suspended shall meet the product quality requirements and must be inspected for bending deformation.

2. During transportation and stacking, the plates should be laid flat and cannot be pressed, and high temperature and harmful substances can be avoided.

3. When the keel is installed, it must be leveled and the spacing deviation should be controlled within the allowable range. When installing, if the dimensions are deviated, it should be adjusted before inserting in order. It must not be hard-inserted to prevent deformation.

4. When installing the keel, the direction of the keel should be determined according to the design trend of the ceiling measurement construction drawing. After the determination, the keel distance and punching point should be marked on the roof.

5, electric hammer drilling, drilling depth should not exceed 4 cm, to prevent the destruction of embedded wires inside the wall tubes. After the punch is ready, expand the matching inner bulge into the hole.

6, according to the height of the corner, the galvanized wire saw is good, into the expansion, according to the length of the room to cut the keel, with a nut to the keel fixed on the copper wire.

7, when laying ceilings should also be based on the measurement of construction drawings, the shape of the plate, the color is arranged in order, when the plate is placed, the pinch plate should be strictly seamless with the corners, and to indicate the control line hole.

8, the dungeon ceiling must be set up inspection holes, many people in the home decoration kitchen ceiling is generally not set up inspection holes, that affect the appearance, do not know once the ceiling line equipment failure can not check to determine what parts are, what the reason, Even more unrepairable. Therefore, it is better to set the inspection hole for the suspended ceiling of the pipeline, and choose the site that is relatively easy to inspect, as well as the artistic treatment of the inspection hole, such as the combination of a lamp or a decoration.

Editor's summary: The installation sequence of ceilings for kitchens and kitchens is introduced here. I hope to help everyone. If you want to know more related information, you can pay attention to this website information.

Kitchen and ceiling

Kitchen Accessories

Kitchen sinks accessories. Useful collection for sinks.


Kitchen Accessories,Kitchen Equipment,Kitchen Board

Jiangmen MEIAO Kitchen And Bathroom Co., Ltd. , https://www.meiaosink.com