Construction Technology Daquan - Wood Surface Oil Painting

First, the glass fixing method:

1. Drill a hole in the glass, and fix the glass on the wooden skeleton and liner with chrome-plated screws and copper screws.
2, with hardwood, plastic, metal and other material pressing the pressure of the glass.
3. The glass is glued to the liner with epoxy resin.

Second, the mirror glass installation process: cleaning the base → vertical bar → nail liner → fixed glass.

1. Cleaning up the base layer: When masonry walls and columns are built, the wooden bricks shall be buried first, and the position shall correspond to the vertical size and horizontal size of the mirror surface. Generally, the spacing between the wooden blocks is 500mm. Hot asphalt or other waterproof material should be brushed on the plastering surface of the base layer, and a waterproof layer can also be sandwiched between the wood liner and the glass. The purpose is to prevent the moisture from deforming the wood liner or causing the mirror coating to fall off.

2. Ribs: Small wooden bars with a wall bar of 40 squares or 50 squares are fixed on wooden bricks with iron nails. The installation of small mirrors are mostly two-way standing ribs. The installation of large mirrors can be unidirectional. The horizontal and vertical wall ribs are aligned with the wooden bricks to make the lining board and the mirror surface fixed. Rigging uses a long ruler to check the flatness.

3, nailing liner: Liner is 15mm thick wood or 5mm plywood, nailed to the wall, the nail head should not be in the board. The gap between the plate and the plate should be set at the position of the ribs. The plate surface should be free from warping, peeling, and flat and clean.

4. Mirror mounting: After the mirror is cut according to the design size and shape, it must be fixed. Commonly used methods are screw fixation, studded fixation, adhesive fixation, pressure fixation and bonding support fixed five.

Third, aluminum-plastic board wall construction preparation:

1. Material: Select aluminum-plastic panel according to design requirements to determine the spacing of the keel; select the appropriate keel section and dimensions. At the same time, aluminum should be properly stored after entering the market to avoid deformation.
2. Construction equipment: cutting machine, pistol drill, impact drill, nail gun, horizontal ruler, square ruler, powder bag, screwdriver, crossed stylus, etc.
3. Aluminium-plastic panel wall construction technology: keel arrangement and elastic wire → installation and leveling keel → installation of aluminum-plastic composite panel → trimming and sealing

Fourth, aluminum plastic panel wall operation points:

(1) Keel arrangement and bouncing
1. Elastic lines: Determine the elevation control line and the keel layout line. If there is a change in the elevation of the ceiling, the corresponding position of the variable section should be determined, and then follow the elevation line to fix the angle aluminum.
2, to determine the keel position line: According to the size of the aluminum plate and ceiling area size to arrange the structure of the ceiling frame size, requires the plate combination pattern to be complete, when leaving the edge, the size of the edge to be uniform or symmetrical, will Arrange the dragon's skeleton position line above the elevation line.
3. Install and level the keel: According to the vertical and horizontal elevation control line, start from one end, adjust the edge while installing and then fine tune again.

(2) Board installation: The installation of aluminum-plastic panel and dragon skeleton mainly consists of hanging hooks or self-tapping screws. It is also possible to use steel wire ties. When installing, arrange the wires according to the elastic panels, starting from one direction. Install them one by one, and notice that the hook is fixed with the keel first, and then hook the small hole on the side of the plate. Aluminium plastic panels should be handled with care. Protect the board from impact or scratches. When using M5 self-tapping screws, first use a hand drill to drill a hole with a diameter of 4.2 mm and tighten the screws.

(3) End treatment: When the peripheral edge of the wall is not in conformity with the modulus of the square plate, after obtaining the approval of the designer and the supervisor, it may not use the method of taking the edges by the square plate and the wall plate. The board or plasterboard is used for ceiling treatment.

Paint glass arrangement glass bricks craft glass

Ceramic Film

Sunplus Ceramic Film abrasives are made with Film and CERAMIC aluminum oxide. The film backing provides greater tear resistance, and the ceramic grains offer faster cutting results and high removal rates & increased performance.

Sunplus Abrasives Co.,Ltd is a leading company in the field of researching and manufacturing premium quality coated abrasives for a wide range of applications.
Founded in 2004, Sunplus has developed into an enterprise with the leading fully - automated Germany system production line and technology to make high and stable quality sandpaper. All our materials are imported from Europe, Japan and Korea, which assures high quality products from the source.
We constantly invest in research and development so as to ensure that our products will always be a step ahead of competition.

Ceramic Film,Sanding Film,Ceramic Film Sandpaper,Ceramic Round Disc

GUANGZHOU SUNPLUS TECHNOLOGY CO.,LTD , https://www.sunplussandpaper.com