Toilet renovation hydropower installation precautions

Hydropower renovation can be said to be a highlight in home improvement. The problem of hydropower reform will have an important impact on the entire home improvement as well as the future life. Therefore, Xiao Bian is here to introduce the precautions for toilet renovation and hydropower installation . I hope to help everyone understand the home improvement and installation of hydropower installation precautions.

Toilet renovation hydropower installation precautions

1. After the location of the washing machine is determined, the drainage of the washing machine can be considered to be inside the wall of the drainage pipe, which is beautiful and convenient;

2, if you want to close the extra floor drain, you must block the gap between the drain pipe and the floor drain to prevent the overflow of the water.

3, to think ahead of time to use gas or electricity water heaters, to avoid the temporary replacement of water heaters, leading to repeated changes in the waterway;

4. The waterway design should first of all want to have a good water-related equipment, such as water purifiers, water heaters, kitchen treasures, toilets and wash basins. Their location, installation methods, and the need for hot water;

5. It is advisable to have the owners present in the suppression test and to play a supervisory role; because some decoration teams will deceive the owners in this section. The method is: When the pressure is applied, open the “return valve” of the pressure pump to form a loop. Although the pressure pump seems to work, there is not much pressure in the tube. Especially for the electric pressure pump, the students should pay more attention. If you don’t understand, ask a professional to help you look at it.

6, in addition to the bathroom to leave wash basins, toilets, washing machines and other outlets, it is best to pick one out, then pick up the water to the ground, etc. is very convenient; this depends on the owners of everyone like the problem.

7. There should be pressure test after the waterway reform, but nowadays, many decoration teams do not suppress the test. They will cheat you in many ways, saying nothing to suppress, there is pressure in the pipes, and so on;

8, after the completion of the kitchen and floor tiles should be checked to see if the drainage of the floor drain is smooth (to remove the drainage rate after the cover drain, which is due to the slow drainage of most of the deep water seal leakage problem);

9, it is particularly important that the washing machine floor drain is best not to use deep water sealing floor drain, washing machine drainage speed is very fast, large displacement, deep water seal leakage of water speed can not be satisfied, the result will directly lead to water overflow;

10, the use of deep water seal floor drain, according to the use of regular clean-up, otherwise the floor drain below the pad to hang dirty things will not achieve a closed effect;

11. When picking up the house, check whether each drain in the kitchen and bathroom is open. If the drain is slow, the property should be dredged in a timely manner. During the renovation, the drain should be protected. In particular, during the period when kitchen tiles are tiled, it is most likely to cause cement. Falling into the drain leads to blockage;

12, when the waterway transformation, to install the electric water heater, sub-tap and other reserved cold, hot water pipe should pay attention to four points:

(1) The height of the hot and cold water nozzles is the same;

(2) Cold and hot water inlet nozzles should be two centimeters higher than the wall surface. When laying wall tiles, bricklayers should also be required to finish the wall tiles to ensure the same level of wall tiles and water pipe nozzles. If the size is not appropriate, after installation of electric water heaters, sub-tap, etc., it may be necessary to purchase an additional pipe hoop, inner wire and other connectors to complete the installation;

(3) Cold and hot water supply pipe vertical wall surface, after the wall tile should also be careful not to let the bricklayer get screwed up (not vertical, then the installation can be strenuous);

(4) Ensure that the distance is 15 cm (most current electric water heaters, sub-faucets, hot and cold water, water spacing are 15 cm, and some are 10 cm);

Notices on hydro-electricity reconstruction 13. Do not forget to do waterproofing on the bathroom floor, especially on the ground. If the shower area is not a closed shower room, the waterproof surface of the wall should be 180 cm high to prevent the wall from sweating in the future. Before closing the cement, the 24-hour closed water test must be done. No problem can spread the bricks.

Xiao Bian summary : I believe we read the above content, we should understand the toilet renovation hydropower installation precautions, I hope to help everyone do a good job in the transformation of the toilet water and electricity installation . For more exciting information, please continue to pay attention to this site.

Hydropower installation bathroom renovation experience

Product Description

Grinding Glass Microsphere
1. To select glass beads in types, sizes and quantity in accordance with viscosity, rigidity and dispersal of the grinded materials. 
2. To clean glass beads and mill's inside before the grinding processed. 
3. To input the grinded materials firstly and a curtain amount of glass beads later. To add continuously glass beads till 70%~80% of the mill is full. 
4. To forbid to keep glass beads funning with little grinded material for a long time, as the glass beads inside the mill are easily broken at high speed operation. 

5. To add new glass beads to ensure the quality and efficiency of grinded materials. 

Grinding Glass Beads are mainly used for the disperser, grinding media of industries, such as coloring, paint, ink, coatings, resins, chemical engineering, with the advantages of smooth surface, even size, high hardness, good chemical stability. Thanks to the characteristics of heat-resistant, wearable, compression strength, the filling-type bead could be used to improve glass fibre reinforced plastic, rubber, and so on.
The glass bead can be produced based on the standard of countries or areas, such as EN1423/1424, AASHTO M247, BS6088, JIS R3301 and KS L2521 etc.


Grinding Glass Beads

Grinding Glass Beads1

Grinding Glass Beads

Grinding Glass Beads,Grinding Glass Beads Borosilicate,Grinding Glass Beads Road Marking,Gj-I Grinding Glass Beads

CHIYE GLASS BEAD (HEBEI) CO., LTD , https://www.chiyeglassbeads.com